A 12-foot-wide shared-use path runs along the east side of Rymfire Drive. It starts at Ralph Carter Park and runs south to Royal Palms Parkway, where a marked pedestrian and bicycle crosswalk takes you across. A planning study of the Rymfire corridor described that layout in 2017. Just south of that crossing is the Lehigh Greenway Rail Trail.
For anyone in Lehigh Woods, that spur is the R Section's own paved way onto the Lehigh Trail, so you can walk or pedal there from home. The rest of this piece follows the trail east from that crosswalk.
Ralph Carter Park Is the Neighborhood's Trailhead
Ralph Carter Park sits at the north end of the spur, beside Rymfire Elementary at 1385 Rymfire Drive. The park covers 13.1 acres and has 77 parking spaces, plus more parking when those fill up. The park also has a shaded playground, a covered patio and gazebo with picnic tables and grills, two lighted multipurpose fields, a mini skate park and a lighted basketball court. A 0.4-mile walking trail circles the park.
That makes it a good place to start a family ride. Younger riders can warm up on the 0.4-mile loop, take the Rymfire spur down to Royal Palms Parkway, and come back to grills and a playground. Neighbors coming from a few streets over can drive and park here instead of riding the shoulder of Rymfire Drive. The Rymfire study noted that the rail-trail itself does not connect directly to the residential streets around the school, which is why the Rymfire Drive spur matters.
The Railroad Under Your Tires
Once you cross Royal Palms Parkway, you are riding on an old railroad bed. A Flagler County Parks historical marker says the Lehigh Portland Cement Company built a southeastern plant here during the post-World War II building boom. In 1952 it laid a spur from that plant, just east of today's Colbert Lane, west to the Florida East Coast Railway in Bunnell. According to the marker, an average of 150 rail cars of cement left on that line every day. The plant's switchyard was busy enough that the Florida East Coast Railroad kept its own switch engine there. The plant and the spur both closed in 1965, after labor disputes and economic uncertainty.
The route still runs where the freight did. The City of Palm Coast puts the paved trail at 6.7 miles. It runs from U.S. 1 north of Bunnell through Town Center and Graham Swamp Preserve and follows the Lehigh Canal for much of the way. Flagler County owns and maintains it, and lists the corridor as about 8 miles on 194.95 acres. The county also notes that trees cover the trail nearly the whole way, and that it crosses traffic at grade in only two places, Old Kings Road and Belle Terre Parkway. Two road crossings over the length of a long ride make this trail a good choice for riders who don't like traffic.
Belle Terre Parkway: The Full-Service Stop
Heading east from the Rymfire spur, the first big stop is the city's Lehigh Trailhead at 1350 Belle Terre Parkway. It opened to the public on February 24, 2024, the same day as the Southern Recreation Center next door. When it opened, the city counted more than 70 paved parking spaces, a restroom building, pavilions, benches and new lighting.
The trailhead is open 7 a.m. to 7 p.m. every day. It has separate dog parks for small and large dogs. Both close Tuesdays and Thursdays until noon for maintenance, and on those mornings the city points dog owners to the dog parks at James F. Holland Memorial Park. The trailhead also has 18 community garden plots, 12 standard and six raised ADA-accessible, each 4 by 10 feet. A plot costs $15 for a six-month term, and the city keeps an interest list at the Community Center front desk, 386-986-2323.
Next door at 1290 Belle Terre Parkway, the Southern Recreation Center is a good reason to time a ride around something else. It has 15 Har-Tru clay tennis courts and 12 pickleball courts, six of them covered, plus locker rooms and two multipurpose rooms. The city's page also lists a food and beverage space run by Redefined Food Co., with grab-and-go breakfast, handhelds, smoothies, and a full bar with indoor and outdoor seating. The center is open 7:30 a.m. to 9 p.m. on weekdays and 7:30 a.m. to 2 p.m. on weekends, and the city says hours depend on the weather. An annual pass includes court reservations up to seven days ahead and free access to the Palm Coast Aquatics Center.
Colbert Lane: Where the Plant Stood
Past Town Center and through Graham Swamp, the trail ends at Flagler County's trailhead at 5875 Colbert Lane. This is where the railroad history is easiest to see. The marker says the trail's eastern end sits on what used to be the cement plant's switchyard. One smokestack still stands where the plant was. The plant ruins and the stack are visible from the marker, across Colbert Lane to the south and east.
Colbert Lane also has mountain biking. The Graham Swamp Mountain Bike Trail is at 5140 Colbert Lane. It hosted the Graham Swamp 360 endurance race in March 2026, with laps of roughly seven miles.
Don't confuse it with the city's separate Graham Swamp Trail, the boardwalk route through the wetlands. That one is closed. In February 2026, Palm Coast said surveys had found compromised boardwalks and bridges, and that it would start a major renovation. The city's March 2026 update said the work had grown into a fuller rehabilitation of boardwalks, bridges and trail surfaces. The trail will stay closed indefinitely while crews finish. The city's rehabilitation project page has the latest status, so check it before you plan a loop that uses those boardwalks.
The Network Being Built Around Your Spur
The Lehigh Trail is turning into the middle section of a longer north-south trail system. The pieces are funded on different schedules, and the regional transportation planning agency's 2026 List of Priority Projects, adopted June 24, 2026, lists them.
The biggest gap is the 3.5-mile Graham Swamp Trail link. FlaglerLive reported in December 2024 that it will run south from the trailhead on Old Kings Road, behind Toscana and Hidden Lakes, to meet the Lehigh Trail. FlaglerLive also reported plans for a 12-foot-wide paved path with elevated boardwalks through wet areas. The adopted list gives that segment $1.2 million for preliminary engineering in fiscal 2025/26, and lists construction as TBD.
Two other pieces are fully funded. A Lehigh/Graham Swamp trailhead and parking facility near State Road 100 has $1.31 million for construction in fiscal 2027/28. The Old Kings Road South trail, which runs to the Volusia County line, has $4.85 million for construction in fiscal 2026/27. The southern pieces have construction dates. The link north toward the Woodlands waits on the Graham Swamp gap.
If a home near the Rymfire Drive spur or a short ride from the Belle Terre trailhead is on your list, The Goellner Team would be glad to talk through R Section homes with you. Request a Personalized Consultation and tell us how you'd like to reach the trail.